IL 84 Over the Apple River | Hanover, Illinois

WHKS provided Phase I and II engineering services to the Illinois DOT to replace the bridge over the Apple River and reconstruct the intersection at IL 84 and Fulton Street in Hanover, Illinois. The Phase I work consisted of preparation of a Project Report which included geometric studies, an Intersection Design Study, traffic analysis, drainage analysis, bridge inspections, Structure Geo-technical Report and Type, Size, and Location (TS&L) plan. Phase II services included the preparation of final roadway, drainage and bridge plans.